Gaya APA

KUSUMASTUTI, B, D. et al (2026). Analisis Kebutuhan Waktu Erection PC-I Girder Menggunakan Crawler Crane Pada Variasi Kondisi Zona Pekerjaan (Studi Kasus: Pembangunan Jalan Tol Solo - Yogyakarta - NYIA - Kulon Progo Seksi II Paket 2.2B Trihanggo - Junction Sleman STA 54+635 s.d. STA 57+839) = Analysis of the Time Required for PC-I Girder Erection Using a Crawler Crane Under Various Work Zone Conditions (Case Study: Construction of the Solo–Yogyakarta–NYIA–Kulon Progo Toll Road, Section II, Package 2.2B, Trihanggo–Sleman Junction, STA 54+635 to STA 57+839) . Semarang: Politeknik Negeri Semarang.

Gaya MLA

KUSUMASTUTI, BELLA, DWI. et al. "Analisis Kebutuhan Waktu Erection PC-I Girder Menggunakan Crawler Crane Pada Variasi Kondisi Zona Pekerjaan (Studi Kasus: Pembangunan Jalan Tol Solo - Yogyakarta - NYIA - Kulon Progo Seksi II Paket 2.2B Trihanggo - Junction Sleman STA 54+635 s.d. STA 57+839) = Analysis of the Time Required for PC-I Girder Erection Using a Crawler Crane Under Various Work Zone Conditions (Case Study: Construction of the Solo–Yogyakarta–NYIA–Kulon Progo Toll Road, Section II, Package 2.2B, Trihanggo–Sleman Junction, STA 54+635 to STA 57+839)". Semarang: Politeknik Negeri Semarang, 2026. SKRIPSI DIGITAL.