Gaya APA
HARYANTI, I, T. et al (2026).
Analisis Produktivitas Pekerjaan Pile Cap, Pier, dan Pier Head Ramp Off Dengan Metode Time Study
(Studi kasus : Proyek Jalan Tol Solo–Yogyakarta–NYIA Kulon Progo Seksi II Paket 2.2 Trihanggo–Junction Sleman STA 54+635 s.d. STA 57+839) = Analysis of Construction Productivity for Pile Cap, Pier, and Pier Head Ramp Off Using the Time Study Method
(Case Study : Proyek Jalan Tol Solo–Yogyakarta–NYIA Kulon Progo Seksi II Paket 2.2 Trihanggo–Junction Sleman STA 54+635 s.d. STA 57+839) .
Semarang:
Politeknik Negeri Semarang.
Gaya MLA
HARYANTI, INDAH, TRI. et al.
"Analisis Produktivitas Pekerjaan Pile Cap, Pier, dan Pier Head Ramp Off Dengan Metode Time Study
(Studi kasus : Proyek Jalan Tol Solo–Yogyakarta–NYIA Kulon Progo Seksi II Paket 2.2 Trihanggo–Junction Sleman STA 54+635 s.d. STA 57+839) = Analysis of Construction Productivity for Pile Cap, Pier, and Pier Head Ramp Off Using the Time Study Method
(Case Study : Proyek Jalan Tol Solo–Yogyakarta–NYIA Kulon Progo Seksi II Paket 2.2 Trihanggo–Junction Sleman STA 54+635 s.d. STA 57+839)".
Semarang:
Politeknik Negeri Semarang,
2026.
SKRIPSI DIGITAL.