Faktor - Faktor yang Menghambat Kecepatan Proses Bongkar Muat pada PT Pelabuhan Indonesia III (Persero) Cabang Terminal Petikemas Semarang

Khusnul Khotimah - Nama Orang;

The purposes of this final project are to describe loading and discharging process, to identify the factors that hamper the speed of loading and discharging process, and to solve the constraint of loading and discharging process.

This final project used descriptive qualitative method. The data for this final project are qualitative, quantitative, primary, and secondary data. The data were collected by doing observation, interview, and literature study.

The result of this final project shows that there are seven activities in loading and discharging process. There are checking documents, distribution documents, preparation,haulage activity, loading and discharging process, haulage activity and stacking. The factors that hamper the speed of loading and discharging process are less skill of the parties involved in the process of loading and discharging, changing shifts, readiness of the equipments, the amount of equipments, the high demand for loading and discharging activities, receiving, delivery and relocation, capacity of container yard, container’s positions on the container yard, natural factors and “approval” process. To solve the constraint of loading and discharging process, Semarang Container Terminal Branch held a training to container crane operator, rubber tyred gantry operator and trailer operator, give maintenance for equipments intensively, the priority service of loading and discharging at the time of high demand for loading and discharging activities, receiving, delivery and relocation, stacking containers in empty parts of container yard when the container yard has been full of container. They have to work overtime after bad weather occurs. They completing revisions of “approval” document in quick time.


Fulltext
  • Harap masuk untuk melihat lampiran
Informasi Detail
Judul Seri
-
No. Panggil
AN 079 KHU 2013
Penerbit
Semarang : Politeknik Negeri Semarang., 2013
Deskripsi Fisik
xvi, 76 hal.; 29,5 cm
Bahasa
Indonesia
ISBN/ISSN
AN079/13
Klasifikasi
-
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subjek
ADMINISTRASI NIAGA
Info Detail Spesifik
-
Pernyataan Tanggungjawab
-
Versi lain/terkait

Tidak tersedia versi lain

Komentar

Anda harus masuk sebelum memberikan komentar

  • Panduan
  • Area Anggota

Tentang Kami

Si-Repo adalah platform digital yang dikelola oleh UPA Perpustakaan Politeknik Negeri Semarang, menyimpan karya ilmiah seperti Tugas Akhir, Skripsi, dan Tesis dari sivitas akademika Polines, untuk mendukung kebutuhan akademik, penelitian, dan pengembangan.

Pengunjung Web

Hari ini : Minggu ini : Bulan ini : Total :

© 2025 — Perpustakaan Politeknik Negeri Semarang

Ditenagai oleh SLiMS
Pilih subjek yang menarik bagi Anda
  • Karya Umum
  • Filsafat
  • Agama
  • Ilmu-ilmu Sosial
  • Bahasa
  • Ilmu-ilmu Murni
  • Ilmu-ilmu Terapan
  • Kesenian, Hiburan, dan Olahraga
  • Kesusastraan
  • Geografi dan Sejarah
Icons made by Freepik from www.flaticon.com
Pencarian Spesifik
Kemana ingin Anda bagikan?