TA DIGITAL
Sistem impor bahan baku pada PT Daya Manunggal Salatiga
PT Daya Manunggal manufactured textile, which needed to import cotton as the raw material. There fore, this final project report is entitled “ Importation System of Cotton Raw Material at PT Daya Manunggal ”
The purposes of this final project are to identify the parties involves, importation system, document needed in import activities, the obstacle of imported raw materials, the recommendation to the company and to know the solution to face the obstacles..
The data were collected by the observation, interview, literary study. This final report is written descriptively.
The result shows that the parties involved in importation system are Sales Agent of PT Ragam Logam, Mandiri Bank, Directorat Jendral Bea dan Cukai Tanjung Emas Semarang, Disperindag Central java, EMKL PT Karya Kencana, Shipping company PT OOCL, PT China Insurance Indonesia, PBM Jangkar Mas Semarang. The document’s for importing raw material are Invoice, B/L, Packing List and BC 2.3. The obstacles faced by the company are such as delay of
shipment, delay of receiving document, delay of the payment to advising bank,
delay of goods delivery caused and difference between the qualities of the cotton
received from the request.
Tidak tersedia versi lain